KWS Infra Eindhoven will soon be carrying out maintenance work on the N273, commissioned by the Province of Limburg, at the intersection under the N280, between hectometers 47.4 and 48.4.


Why is this work necessary?
Recent research shows that the asphalt surface no longer meets the required standards. This poses a risk of further damage to the road. Winter frost, in particular, can cause existing damage to worsen rapidly.
To prevent further damage and more extensive repairs, the surface will therefore be replaced before winter. Due to the urgency of the situation, the work will be carried out in the near future.
Planning
The work will take place from 9:00 p.m. on Friday, October 30, through 5:00 a.m. on Monday, November 2*.
During this period, the intersection of the N273 under the N280 will be closed. Through traffic on the N273 will not be permitted. It will also not be possible to merge onto the N273 from the N280 or onto the N280 from the N273.
Accessibility
The following traffic restrictions will be in effect during the construction work:
- The "Terug in de Tijd" Museum, Mertens Transport, and Make it Easy Pet Salon will remain accessible, but are located within the cordoned-off area.
- The bike path will remain open to cyclists during the construction work. Please keep in mind that in the event of an emergency, emergency services may also use the bike path.
- Emergency services follow a pre-determined route and, in an emergency, may use the bike path, among other routes.
- During the construction work, Arriva will operate on a modified route. Up-to-date information about the schedule and any canceled stops can be found on the Arriva website.
Detour Routes
To minimize traffic disruption as much as possible, a large-scale detour route will be set up. This route is marked in dark blue on the detour map.

Please allow for extra travel time
We understand that the construction work may cause some inconvenience. Due to the road closures and detours, travel times for road users, residents, visitors, and suppliers may be longer than usual. Please allow for extra travel time.
Questions or comments?
Do you have any questions about the construction work, accessibility, or detours? Please contact Site Manager Isa Vermin:
Email: ivermin@kws.nl
Phone: 06-50224931
You can also send an email to onderhoudlimburg@kws.nl.
In case of an emergency, please call the emergency hotline at 06-50226375.
Follow the construction progress via the BouwApp
Would you like to stay informed about the construction work and any changes? Then follow the project on the BouwApp:
- Download the BouwApp for free from the Apple App Store or Google Play Store.
- Search for “Major maintenance of paved surfaces in the province of Limburg.”
- Open the project and click "Follow."
- Under “Subprojects,” you will find the projects that will be carried out in Limburg in the coming period.
- If you'd like to stay informed about specific subprojects, you can follow them individually.
- Select the target audience that best suits your needs, such as “local residents” or “travelers.”
We ask for your understanding regarding the temporary inconvenience and are doing our best to carry out the work as smoothly and safely as possible